Corn tablet production line 2 tons of equipment installation site
At the installation site of the 2-ton equipment of the corn tableting production line, there was a tense and orderly busy scene. The professional installation team first accurately determined the installation location of the equipment based on the detailed construction drawings. The large lifting equipment slowly lifted the heavy equipment parts, and the installers skillfully docked and fixed them, and each bolt was tightened in place. During the installation process, the technicians strictly controlled the quality of each link, and repeatedly measured and adjusted the horizontality, verticality and other parameters of the equipment. At the same time, the electrical engineers carefully wired to ensure that the connection of the electrical system was safe and reliable. After the collaborative efforts of the team, the 2-ton equipment of the corn tableting production line was gradually installed, laying a solid foundation for the subsequent commissioning and production operation. Although the on-site staff were tired, they were full of a sense of accomplishment and expectations for future production as they watched the production line gradually take shape.